Terminal Zom Nation
Nearby arts & entertainment
44870
44870
44870
44870
Columbus Avenue
Zombie HO Scale Train Layout
The saloon so far! Need to finish up the front sign and it will be ready for the layout.
Moved things around again. Couldn't figure out what to do with this small corner. Well now its the industrial area. Have to finish moving things around in the other area still not 100 percent happy with the placement of things.
It's nasty outside so its train running day!
Added some hobos bumming a ride!
Service truck loaded and ready to head out! I think the small details are my most favorite to work on.
Running at night with the lights!!
Working on the wiring for the lights. Still not anywhere near done. I made each building removable so I can work on scenery and still enjoy the lights.
Added a flashing led to the water tower. Haven't figured out what I want to put on it yet. And a little light show in the display case.
Finally got the matching water tender for my J Class. Changed out the old horn hook couplers and plastic wheels. Now to find the matching passenger cars for a decent price.
Working on the lower level of the city. Still a ton to do but its getting there!
1st picture is before. Next set of pictures are after I painted & detailed. Made a super big difference. Still not done but break time for tonight!
Finally got the Northern Light & Power background building on the layout again! Wanna add some billowing smoke out of the stacks would it look better painted or using cotton?
Bank interior and lighting finished! On to the next.
Got another building lit up! Still way more details to come.
Picked up a custom J Class to add to the collection. Thanks again Micheal Mims she runs great!!
Is there such thing as addicted to putting leds in everything. Because if so I got it lol. Still alot of buildings to go. Also found these wood sign kits I put together.
Took a break from buildings and started working on the background wall. Need a couple more pieces to get it finished up.
Short video then the whole layout. Still a work in progress but its deffinatly looking better than ever before. Corners are a little tight for this monster but best I can do with the space I have. Facebook destroyed my second video.
Finished up the wifes donut shop today! And got it placed. Pretty happy with the way it turned out.
BLI 2-6-6-4 pulling my daughters Toy Story cars!
Got this from a good friend today! BLI 2-6-6-4. Bit tight around the corners but I only needed to fix 2 spots and now it clears everything!
Working on the wifes donut shop! Nothing is glued just temporary put together to test the leds. Have to finish paint and add interior details.
Got the RS-3 reset and running good. And finally got the BLI Erie running. Still messing around with some settings. Haven't quite figured out the controller just yet.
Got all the engines but 1 out tonight and got them all cleaned up! I have another one coming soon!
Got another interior built! One side is the barber shop the other is the to***co shop. Got them placed and temporary lit. Gas station is next on the list! Then on to scenery along with street lights.
Working on some building lighting today! Just gotta finish a couple more then I can start adding in some scenery.
Got this cabinet done and they look awsome!! I have some spotlights for zom Rushmore I wanna add in to.
Working on putting some led lights in. Just need to finish wiring them up!
Got my tug boat complete!! Gonna add it on the corner and the background building will become the repair/maintenance shop. I have some welders and other scenery to add on the ground as well. Now just to make the signage for the building!
Time for 1 last run before I switch it up again!
I gotta alot of new things up the last couple days. Built this over pass from balsa wood and also the city streets. Roads still need alot of work and other details. Started putting up alot of my small details in the factory area. Still need to move them around a bit to make everything fit. I got a new tug boat that I've been working on and I'm pretty sure I found the perfect spot for it. Also got a new thing coming but I dont want to ruin the suprise quite yet but as soon as it gets here you will know!!
Dont mind the wall in the beginning..its gonna get fixed soon. Had a duh super glue moment lol. Haven't done a run around in awhile so here it is!!
Been working hard on the layout got alot of new things added in also alot has changed. Went to a garage sale and got an absolutely amazing deal on these new buildings and engines I couldn't pass it up. Its deffinatly crazy to see how far this layout has come since my first attempt. I dont know about any one else but I'm constantly standing here staring trying to figure out what I want to add in next or what little details I want. Nothing is near complete and even though its a small layout I dont think it ever will be.
Sharknose Baltimore and Ohio pulling some passenger cars!
Time to play and enjoy the scenery so far!!
Painted some more background trees in and started getting some static grass down. Still trying to figure out the campground layout below. Really hard to do what I want in such a small space but its coming along very nice!!
Got the background sky fully painted. Just need to add some clouds and more trees!
Got 2 more buildings almost complete and placed where I think I want them. Also started working more on the campground area. Need to add more plaster cloth and finish painting it all. Then I can start adding in some scenery!!
Got a few more amry vehicle chained! Still have to add some more details. Gonna paint and make the shipping containers the mobile command stations. Also got a new saloon built and placed. Things are really coming along nicely!!
2 more completed & chained down!!
Click here to claim your Sponsored Listing.
Videos (show all)
Category
Contact the establishment
Website
Address
Sandusky, OH
220 W. Perkins Avenue Unit A
Sandusky, 44870
Piercing & Pole by Michelle DeMore All services by appointment only