The Wisconsin Department of Transportation is completing the Zoo Interchange Project in Milwaukee County. Work is scheduled to be completed in late 2023.

The last portion of the project, I-41 between Swan Blvd and Burleigh St, is called the North Leg.

05/10/2024

GOOD NEWS: Swan Blvd over I-41 reopened this morning.

Send a message to learn more

Zoo Interchange North Leg Project: Overnight closures next week 04/24/2024

ICYMI: Sean Race discusses the recent closure of Swan Blvd over I-41 and upcoming overnight operations in the Zoo Interchange North Leg.

Zoo Interchange North Leg Project: Overnight closures next week Sean Race with the Wisconsin Department of Transportation joins FOX6 WakeUp with a look at upcoming construction.

04/18/2024

PROJECT UPDATE: as Spring 2024 weather improves we will be finalizing what Winter 2023 did not allow us to finish. See info below regarding a closure and some repairs on the Swan Blvd bridge over I-41.

03/05/2024

AWARD WINNER: On World Engineering Day, we’re reflecting on the zoo interchange, an engineering accomplishment that’s making travel more efficient in southeast Wisconsin.

The Zoo Interchange is one of the busiest interchanges in the state and is a critical hub for commerce and tourism. The final segment of the project was the North leg, along US 45 between Swan Boulevard and Burleigh Street in Milwaukee County. The project expanded nearly two miles of highway from three to four lanes in each direction, as well as reconstructed the North Avenue interchange. The project lasted three full construction seasons, making management of interim traffic patterns critical to the long-term success of the project.

The Zoo Interchange North Leg project recently won the Large Contract award at WisDOT’s 2023 Excellence in Construction Awards. Read about all the award-winning projects here: https://wisconsindot.gov/Pages/about-wisdot/newsroom/news-rel/012224-2023ConstructionAwards.aspx

Photos from Wisconsin Zoo Interchange North Leg Project's post 12/20/2023

PHOTO UPDATE: in Spring 2021 the Zoo Int North Leg began the intricate reconstruction of a new UPRR bridge over I-41. Work began by building a temporary UPRR bridge over I-41 to maintain train traffic so the new UPRR bridge could be demolished and rebuilt. Long-term lane closures and weekend full closures were needed on I-41 for some of the more complicated operations. In January 2023 train traffic was switched to the new UPRR bridge and demolish of the temporary bridge began. Check out a few of these progress pictures.

Photos from Wisconsin Zoo Interchange North Leg Project's post 12/14/2023

PHOTO UPDATE: in Spring 2021 the Zoo Int North Leg began by temporarily widening I-41 SB over Mayfair Rd & Underwood Parkway. In Fall 2023 we opened the reconstructed/widened I-41 NB/SB lanes between Swan Blvd and Burleigh St. Check out a few of these progress pictures.

12/05/2023

PROJECT UPDATE: we have coordinated efforts with Milwaukee County Parks regarding the continued closure and future plans for Underwood Creek Parkway under I-41. Go here for all the info:

https://www.mkecountyparks.org/underwood-creek-parkway-redesign

11/14/2023
Photos from Wisconsin Zoo Interchange North Leg Project's post 11/13/2023

ICYMI: the Zoo Interchange North Leg celebrated the completion of the Zoo Interchange program with a Ribbon Cutting Event on Thursday, Nov 9th.

We still have some final pieces of work to complete with overnight lane/ramp closures, but we are getting really close!

“As one of the busiest interchanges in the state, the Zoo interchange is a critical hub for commerce and tourism throughout Wisconsin,” said WisDOT Secretary Thompson at the ribbon cutting ceremony on Nov. 9. “Together we are delivering safe and reliable access to neighborhoods and businesses, and providing quality infrastructure to efficiently move goods and services to reach all corners of Wisconsin.”

The 1.7-mile North Leg is the final segment to complete the interchange. The project expanded I-41 to eight lanes from Swan Boulevard to Burleigh Street in Wauwatosa. Crews also reconstructed the Burleigh Street and North Avenue interchanges, replaced and built bridges, and built several retaining walls and noise barriers along the interstate corridor.

The project, which began in 2021, finishes $200 million under budget. Read more: https://wisconsindot.gov/Pages/about-wisdot/newsroom/news-rel/110923-zoointerchange.aspx

11/10/2023

PROJECT UPDATE: I-41 NB pavement repair work scheduled for Saturday. Check out the details here.

Photos from Wisconsin Zoo Interchange North Leg Project's post 11/06/2023

OPEN!

Zoo Interchange project milestones; what you need to know 11/03/2023

ICYMI: Sean Race joined FOX 6 Wake Up to discuss the exciting Zoo Interchange North Leg lane/ramp openings!

Zoo Interchange project milestones; what you need to know Jason Roselle with the Wisconsin DOT joins FOX6 WakeUp with the details.

11/01/2023

PROJECT UPDATE: We are excited to announce the reopening of the North Ave entrance & exit ramps at I-41 by Mon, Nov 6th! I-41 NB & SB will also open to 4 lanes south of Burleigh St. 🎉🎉🎉

10/30/2023

PHOTO UPDATE: Meinecke Ave is almost the midpoint of the Zoo Int North Leg's work zone. Meinecke Ave bridge reconstruction (and the reconstruction of 112th & 113th St) occurred in 2021. Check out the progress in this area over the last 3 year.

10/27/2023

ICYMI: Jason Roselle joined FOX 6 Wake Up to discuss the approaching completion of the Zoo Int North Leg project

https://www.fox6now.com/news/zoo-interchange-construction-updates-what-you-need-to-know

10/26/2023

PHOTO UPDATE: check out these photos of the construction of the I-41 bridge over Mayfair Rd, Underwood Creek, a railroad, and Underwood Parkway.

Note the new Mayfair Rd exit ramp bridge in the November 2022 and September 2023 pictures. This new design allows pedestrians, using the east sidewalk of Mayfair Rd, to walk under I-41 instead of crossing the exit ramp itself.

10/24/2023

PHOTO UPDATE: the construction of the UPRR bridge over I-41 was a large and complex feature of the Zoo Int North Leg project. Check out a few progress snapshots of the UPRR bridge construction (along with the construction of I-41 at the same time).

10/20/2023

IT'S HAPPENING! The Burleigh St ramps at I-41 reopen Saturday!

10/13/2023

GREAT NEWS! The I-41 SB pavement repairs have been completed and we will be opening the I-41 SB lane closure at Burleigh St before Friday morning! Thank you for your patience.

PROJECT UPDATE: Starting Saturday I-41 SB will be reduced to 2 lanes at Burleigh St to repair damaged pavement caused by an unrelated utility project. See details here:

10/11/2023

UPDATE: the left lane is now closed on I-41 SB at Burleigh St as we continue to do pavement repairs.

We anticipate the lane to remain closed until this weekend.

PROJECT UPDATE: Starting Saturday I-41 SB will be reduced to 2 lanes at Burleigh St to repair damaged pavement caused by an unrelated utility project. See details here:

10/10/2023

UPDATE: Pavement repair in the right lanes is complete and I-41 SB was reopened to 3 lanes at Burleigh St this morning!

NOTE: As weather allows, I-41 SB will be reduced to 2 lanes again later this week to finish the pavement repair in the left lanes. Stay tuned!

PROJECT UPDATE: Starting Saturday I-41 SB will be reduced to 2 lanes at Burleigh St to repair damaged pavement caused by an unrelated utility project. See details here:

10/05/2023

PROJECT UPDATE: Starting Saturday I-41 SB will be reduced to 2 lanes at Burleigh St to repair damaged pavement caused by an unrelated utility project. See details here:

09/29/2023

HEADS UP: I-41 North exit to Burleigh Street to close October 2.

09/12/2023

Big News! I-41 South traffic was shifted onto their new lanes between Burleigh St and Watertown Plank Rd this morning! We are one step closer to project completion this Fall!

09/01/2023

ADJACENT PROJECT INFO: a repair project on the Hampton Ave bridge over I-41 North is scheduled to start next week. Check out the info!

Photos from Wisconsin Zoo Interchange North Leg Project's post 08/24/2023

PHOTO UPDATE: work continues as we build the barrier wall along I-41.

We are building the barrier wall along the right side of I-41 SB and also the walls that will separate I-41 NB & SB traffic when this project is complete.

Photos from Wisconsin Zoo Interchange North Leg Project's post 08/17/2023

PHOTO UPDATE: concrete work continues as we pave the future I-41 SB roadway between Burleigh St and Swan Blvd.

Photos from Wisconsin Zoo Interchange North Leg Project's post 08/04/2023

PHOTO UPDATE: Work is progressing well. There is a lot of concrete work happening on the future I-41 SB lanes, bridges, and other structures.

Photos from Wisconsin Zoo Interchange North Leg Project's post 07/11/2023

PHOTO UPDATE: last week we poured the bridge deck for the I-41 SB bridge exit to North Avenue eastbound. This was the last bridge deck pour on the Zoo Int North Leg project!

06/30/2023

PHOTO UPDATE: last week we poured the bridge deck for the I-41 SB bridge over North Ave. The bridge deck for the I-41 SB exit to North Avenue eastbound is scheduled to be poured next week.

Want your organization to be the top-listed Government Service in Waukesha?
Click here to claim your Sponsored Listing.

Videos (show all)

I-41 SB girders over North Ave
VIDEO UPDATE: last week we performed a major project milestone and poured the bridge deck for the future I-41 SB bridge ...
VIDEO UPDATE: last week we removed the old I-41 SB bridge over North Ave.  Overhead demolition work was completed on Sat...
TIMELAPSE VIDEO: check out all of the work accomplished on the Zoo Int North Leg in the last month. This video captures ...
VIDEO UPDATE: earlier this month we installed portions of a new storm sewer under Hwy 100 SB.  Hwy 100 SB was closed at ...
🎥VIDEO UPDATE: here is a time-lapse video from this weekend's UPRR bridge construction over I-41. 54 hours of work shrun...
VIDEO UPDATE: the Union Pacific Rail Road tracks were recently switched to the temporary tracks/bridge over I-41 in Wauw...
Sunnyslope Rd girders over I-94 EAST
Zoo Int NB-EB deck pour
Zoo Int E-S ramp deck pour
Elm Grove Road Girders over I-94
I-94 West Bridge over Curtis Road

Address


141 NW Barstow Street
Waukesha, WI
53188

Other Government Organizations in Waukesha (show all)
The CAN Family The CAN Family
212 W North Street # 100
Waukesha, 53188

WELCOME TO THE CAN FAMILY!

Waukesha County Emergency Management Waukesha County Emergency Management
1621 Woodburn Road
Waukesha, 53188

Helping Waukesha County to mitigate, prepare for, respond to, and recover from disasters.

Ralph James Lapp Ralph James Lapp
210 Maple Avenue
Waukesha, 53187

Waukesha County WIC Waukesha County WIC
514 Riverview Avenue
Waukesha, 53188

The Women, Infant and Children (WIC) Nutrition Program is a Federal Program providing food and nutrition information to women, infants and children under 5.

Waukesha County Courthouse Waukesha County Courthouse
515 W Moreland Boulevard
Waukesha, 53188

This page is no longer active. For official and up-to-date information on Waukesha County Government please visit our new page at: https://www.facebook.com/profile.php?id...

Aging & Disability Resource Center of Waukesha County Aging & Disability Resource Center of Waukesha County
514 Riverview Avenue
Waukesha, 53188

Our goal is to empower individuals to make informed choices and streamline access to services.

Waukesha County Volunteers Waukesha County Volunteers
514 Riverview Avenue
Waukesha, 53188

Waukesha County volunteers provide invaluable skills, energy, and support to our community. Our com

Waukesha County Health and Human Services Waukesha County Health and Human Services
514 Riverview Avenue
Waukesha, 53188

Waukesha County HHS enhances quality of life while assuring critical needs are met

Vietnam Veterans of America - Wisconsin State Council Vietnam Veterans of America - Wisconsin State Council
Waukesha, 53188

Vietnam Veterans of America (VVA) - Wisconsin State Council (WSC) serves Vietnam Era Veterans, their

Waukesha County Veterans Services Waukesha County Veterans Services
514 Riverview Avenue
Waukesha, 53188

Waukesha County Veterans Services provides assistance to Waukesha County veterans and their families

Municipal Treasurer's Association of Wisconsin Municipal Treasurer's Association of Wisconsin
W1605 County Highway E
Waukesha, 54481

The Municipal Treasurer's Association of Wisconsin is a professional association which exists to pro

City of Waukesha Parks, Recreation & Forestry Department City of Waukesha Parks, Recreation & Forestry Department
1900 Aviation Dr
Waukesha, 53188

Our mission is to be responsive and committed in providing essential prf services making our community a desirable place to live, work and play.